  4. Network Modernization – Upcoming Work Schedules (2026)

Network Modernization – Upcoming Work Schedules (2026)

Brooklyn College is currently undergoing a comprehensive, multi-year network modernization project. Designed and led by the Office of Information Technology Services, it will deliver dramatically faster speeds, denser coverage, and increased capacity for the future.

5/4/2026 – 5/11/2026

Focused on the Boylan basement and select fourth-floor spaces. To minimize disruption to daytime operations, all work will take place overnight, from 11:00 p.m. to 6:00 a.m.

Departments and spaces affected in this work window:

  • Facilities Hub — Room 0200B
  • Printworks — Room 0208B
  • Mailroom — Rooms 0233B, 0238B, and 0239B
  • Cafeteria and Student Areas — 0100B locations
  • Cafeteria Food Services — Room 0110B
  • Art Gallery — Room 0400B
  • HR Store Room — Room 0439B
  • Fiscal & Business Store Room — Room 0438B

The complete list of spaces for this work window includes:

0238B, 0238aB, 0239B, 0233B, 0208B, 0200aB, 0200bB, 0200jB, 0200dB, 0200fB, outside 0103aB, B103cB, B103B, B103aB, 0102aB, area 0100B, area 0100B, B309B, B301B, area 0100B, area 0100B, area B300B, area B300B, area B305B, area B203B, area B203B, 0110B, 0110B, 0400fB, 0400B, 0400B, 0400eB, 0400gB, outside 0165B, outside 0429B, 0433B, 0439aB, 0438B, area 0V01B.

Additional hallways, classrooms, and adjacent spaces in the basement and 4th floor will also be accessed. Affected departments will receive a more detailed room-by-room schedule from ITS in advance of work in their specific area.